CURSOS DE PUESTA A TIERRA
1. Puesta a Tierra para Sistemas Eléctricos en plantas Industriales. Curso Básico(Dos Días)
2. Puestas a Tierras en la Industria de Telecomunicaciones
(Dos Días)
3. Puesta a Tierra en Subestaciones (Media y Alta Tensión).
(Dos Días)
CURSOS DE CALIDAD DE POTENCIA
Electrical Troubleshooting, Site Surveys
Telefono: (208) 964-0699
ESTÁNDARES APLICABLES A TIERRA ELÉCTRICA:
- ANSI/IEEE std. 80-2000 "Guide to Safety in AC Substation Grounding",
- IEEE 399-1997
IEEE Recommended Practice for Power Systems Analysis (Brown Book)
- IEEE 142-1991 IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems
- ANSI/IEEE Std 837-1989 Standard for qualifying Permanent Connections used in Substation Grounding",
- IEEE/Std 367-1979 :IEEE Guide for the maximum Electric Power Station Ground Potential Rise",
- IEEE Std 665-1995 Std for Generating Station Grounding,
- IEEE Std 1048-1990 IEEE Guide for Protective Grounding of Power Lines",
- ANSI T1.313 Electrical Protection for Telecommunications Central Office and Similar type Facilities",
- IEEE 81-1983
IEEE Guide for Measuring Earth Resistivity, Ground Impedance,
and Earth Surface Potentials of a Ground System
- ANSI/IEEE 1100-1992 REcommended Practice for Powering and Grounding Sensitive Electronic Equipment",
- NFPA 70 "National Electrical Code",
- NFPA 70B "Recommended Practice for Electrical Equipment Maintenance",
- NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces 2000 Edition",
- NFPA 497 "Recommended Practice for the Classification of flammable Liquids, Gases, or Vapors and Hazardous (Classified) Locations for Electrical Installations in Chemical Process areas",
- NFPA 499 "Recommended Practice for the Classification of Combustibles Dusts and of Hazardous (Classified) Locations for the Electrical Installations in Chemical Process Areas",
- OSHA Regulations (Standards-29 CFR), NESC IEEE "National Electrical Safety Code",
- NFPA 780 "Standard for the Installation of Lightning Protection Systems",
- ANSI/UL 467-1984 Standard for Grounding and Bonding Equipment",
- UIT -TS K.27 y V15-E Bonding Configuration and Earthing inside a Telecommunication Building",
- TIA/EIA SP-2327-A Commercial Building Grounding and Bonding requirements for Telecommunications",
- UL 96 A Installations Requirements for Lightning Protection System",
- IEC:77B.WG2 Installation and Mitigation Guidelines:
Earthing and Bonding",
- EEB: LA 400, CS 500-2, CS 556, CS 557 ",
American Petroleum Institute & NACE STDS
Telefono: (208) 964-0699
|
CORPORATE ADDRESS
3309 e. Fairway Dr., Coeur D'Alene, Idaho 83815 USA
Tels: (208) 964-0699
Contact us
www.gstgrounding.com
|
OUR REPRESENTATIVE IN THE CARIBBEAN
ATESCO POWER LIMITED
Ainsley Aarón
2 Crown Trace
Lange Park, Chaguanas
Trinidad W.I.
Tel: 868 671-7143
Fax: 868 671-2191
Cell: 868 685-7283
Contact us
|
OUR REPRESENTATIVES IN MEXICO
NAJI CONSTRUCCIONES, S.A.
ARQ. Fernando Nava
Cefeo 5 Col. Prado Churubusco
C.P. 04230
México, D.F.
Tel./Fax: 5581-5118
Contacte nuestra Oficina
|
REPRESENTACIONES TORRES, S.A.
Ing. Adrián Jesús Torres Ibarra
Herrera y Cairo 1663 Col Ladrón de Guevara
Guadalajara, Jalisco 44660
México
Tel: 044 33 1328 0361
Contacte nuestra Oficina
|
REPRESENTACIONES MADRID, S.A.
Ing. Gerardo Madrid
Fraccionamiento La Rosita
CP 32551, Cd.Juarez, Chih. Mex.
Tel: 656-274- 8176
656-254-3646
Contacte nuestra Oficina
|